View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | RFT |
Bid Number: | 2020-306T |
Bid Name: | ERIN MILLS PARKWAY CORRIDOR IMPROVEMENTS BETWEEN CREDIT VALLEY RD AND BRITANNIA RD, CITY OF MISSISSAUGA, PROJECTS 19-4135, 19-4247, 19-4243 AND 20-4263 |
Bid Status: | Awarded |
Bid Awarded Date: | Thu Apr 22, 2021 (EDT) |
Published Date: | Tue Dec 22, 2020 7:30:00 PM (EST) |
Bid Closing Date: | Wed Feb 3, 2021 12:00:00 PM (EST) |
Date of Planned Notice: | Fri Jul 3, 2020 12:00:00 PM (EDT) |
Estimated Bid Publishing Date: | Wed Aug 12, 2020 12:00:00 PM (EDT) |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
This Contract is for construction of a multi-use path on the west side of Erin Mills Parkway between Credit Valley Road and Britannia Road. Additionally, various intersection improvements along this corridor as well as road resurfacing between Credit Valley Road and Erin Centre Boulevard is also included.
The work to be done includes, but is not limited to:
Construction of a multi-use path (MUP) on the west side of Erin Mills Parkway between Credit Valley Road and Britannia Road. This work shall include, but is not limited to, curb removals, new curb construction, adjustments of catch basins/ maintenance holes/valves/chambers to grade and other works to install the proposed multi-use path with pavement markings, signage and crossrides as specified over the project’s contract duration.
Westbound Bike lane extension along Erin Centre Boulevard from the intersection of Erin Mills Parkway and Erin Centre Boulevard. This work shall include, but is not limited to, curb removals, new curb construction, adjustments of catch basins/ maintenance holes/valves/chambers to grade and other works to install the proposed bike lane with pavement markings, and signage as specified over the project’s contract duration.
Intersection works will include but not limited to, traffic signals, bike signals, directional island removals, smart channel installations, curb-realignments, median island adjustments, and other works as specified over the project’s contract duration. Intersection Improvements under this contract include:
Road Resurfacing Between Credit Valley Road and Erin Centre Boulevard at limits specified. |
Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $439.90, per bid fee - $132.04). |
Categories: |
Show Categories [+]
|
Awarded Summary
AWARD DATE - 2021-02-24
Mailing Address: 10 Peel Centre Drive, Suite A Room 101, Brampton, ON L6T 4B9, Canada
Phone: 905-791-7800 • Toll-free: 1-888-919-7800 • E-mail: procurement@peelregion.ca